RIVERSIDE, CALIFORNIA - Designed to accommodate more than 280,000 vehicles per day, the SR-91 upgrade project included road widening, channel alteration, grade separations, retaining walls, drainage, bike lanes, and landscaping. BASE also provided conceptual design, alternative concepts, geometrics, traffic analysis, structure overpass type, utility investigation and drainage.